Active across Belgium – rapid interventions

DCO Electrical Engineering · Services

UPS and PDU systems for reliable emergency power

DCO Electrical Engineering supports your business with UPS, PDU, emergency power supplies, smart energy storage, peak shaving, capacitor banks, Power analysers and grid analysis. You receive an approach from advice and planning to execution and maintenance, tailored to your existing infrastructure and business operations.

UPS and PDU systems

At a glance

What does DCO Electrical Engineering do for you regarding UPS and PDU systems?

DCO Electrical Engineering provides UPS, PDU, emergency power supply, smart energy storage, peak shaving, capacitor banks, Power analysers and grid analysis for businesses and industry. Execution is tailored to your electrical load, building, usage and safety requirements. With 25 years of experience, we support you from preparation and installation to inspection and maintenance. You can rely on service across Belgium and 24/7 support.

Target group
Businesses and industry; private individuals where relevant
Operating area
All of Belgium · Fabrieksstraat 108, 1930 Zaventem
Support
24/7 support · 25 years of experience
Standards/Safety
VCA-certified; applicable AREI and safety regulations according to the installation

UPS and PDU systems · 1

Emergency power supply for critical equipment

A UPS, Uninterruptible Power Supply, bridges an interruption within its capacity and available autonomy. A PDU, Power Distribution Unit, distributes power but does not generate emergency power itself. For servers, production lines and medical systems, we examine which load genuinely requires support. On that basis, we discuss capacity, bridging time and, if necessary, controlled shutdown or coupling with an emergency generator.

For emergency power supply for critical equipment, we establish the scope prior to execution. You discuss the existing situation, the desired operation and the access conditions for the work area with us. This ensures that the choice of materials, scheduling and any interruptions can be properly coordinated.

  • Preparation based on your building and usage.
  • Coordination of execution, inspection and maintenance.

Request advice today without obligation and discover how we can optimally safeguard your company against power failures.

Quality and Expertise: With years of experience and expertise in the electrotechnical sector, we offer installations of the highest quality, supported by our dedication to excellence and customer satisfaction.

UPS and PDU systems · 2

Installation, configuration and testing of UPS and PDU

We start with an analysis of power requirements, operational processes and critical equipment. Cabling, connection to the existing infrastructure and emergency scenarios are coordinated in advance. During commissioning, we test the agreed operation, including alerts and relevant switchovers. Reliability and Safety, Efficiency and Performance, Tailored Solutions and Quality and Expertise are thus translated into verifiable choices, rather than an open-ended guarantee against all outages.

For installation, configuration and testing of UPS and PDU, we establish the scope prior to execution. You discuss the existing situation, the desired operation and the access conditions for the work area with us. This ensures that the choice of materials, scheduling and any interruptions can be properly coordinated.

  • Preparation based on your building and usage.
  • Coordination of execution, inspection and maintenance.

At DCO Electrical Engineering, we manage the complete installation of UPS and PDU systems, from initial analysis through to commissioning. We begin with a thorough evaluation of your power requirements, business processes and critical equipment. Based on this, we advise you on the right system, tailored to your situation and scale.

UPS and PDU systems · 3

Smart Batteries for energy storage and consumption management

Smart energy storage and peak shaving can be advantageous with fluctuating loads. Smart battery systems are controlled based on your consumption profile, energy contract and any local generation. Off-peak charging only makes sense if tariffs and efficiency losses allow it. Capacity-based billing also warrants a concrete calculation. A battery intended for energy management does not automatically offer the same emergency power function as a UPS; that functionality must be designed separately.

For smart batteries for energy storage and consumption management, we establish the scope prior to execution. You discuss the existing situation, the desired operation and the access conditions for the work area with us. This ensures that the choice of materials, scheduling and any interruptions can be properly coordinated.

  • Preparation based on your building and usage.
  • Coordination of execution, inspection and maintenance.

Our technicians ensure precise installation, including cabling, connection to your existing infrastructure and configuration of emergency scenarios. Everything is extensively tested so that you can rely on dependable operation. Following handover, you receive clear explanations and can rely on our support whenever needed.

UPS and PDU systems · 4

Capacitor banks for an appropriate grid connection

Capacitor banks compensate for reactive power and can improve the cos phi. They are not universal filters that resolve every power issue or power spike. For heavy machinery and irregular loads, we first investigate the consumption profile and any harmonics. The grid conditions and measurements determine whether compensation is appropriate. This prevents an investment from being proposed for a problem that requires a different approach.

For capacitor banks for an appropriate grid connection, we establish the scope prior to execution. You discuss the existing situation, the desired operation and the access conditions for the work area with us. This ensures that the choice of materials, scheduling and any interruptions can be properly coordinated.

  • Preparation based on your building and usage.
  • Coordination of execution, inspection and maintenance.

Efficiency and Performance: We optimise the configuration of your systems to achieve maximum efficiency and performance, resulting in an improved power supply and reduced risk of breakdowns.

UPS and PDU systems · 5

Power analysers and tailored electrical network analysis

A Power analyser, such as from Janitza, can provide insight into the electrical load per machine, distribution board or installation section. Real-time measurement data and possible cloud presentation reveal trends, provided the measurement configuration is correctly selected. Using electrical network analysis and a cost analysis, we compare potential solutions: UPS systems, smart batteries, capacitor banks or modifications to the distribution system. We explain which problem each measure addresses and which assumptions determine the expected return.

For power analysers and tailored electrical network analysis, we establish the scope prior to execution. You discuss the existing situation, the desired operation and the access conditions for the work area with us. This ensures that the choice of materials, scheduling and any interruptions can be properly coordinated.

  • Preparation based on your building and usage.
  • Coordination of execution, inspection and maintenance.

Additional focus areas within your project

  • Installing emergency power supplies
  • Installation of UPS and PDU systems
  • Benefits of Professional UPS and PDU Systems
  • Smart energy storage and peak shaving
  • Capacitor banks for a cleaner grid connection
  • Insight via Power analysers
  • Tailored electrical network analysis and optimisation
  • Smart Batteries for energy storage and consumption management

Tailored Solutions: We provide bespoke installation and configuration services tailored to the specific requirements of your business and infrastructure.

DCO Electrical Engineering is based at Fabrieksstraat 108, 1930 Zaventem and operates throughout Belgium. You benefit from 25 years of experience, a VCA-certified organisation and 24/7 support. As part of DCO Group, alongside DCO Bouw and DCO IT, we coordinate electrotechnical requirements within the broader context of your building and infrastructure.

Project gallery

Photos of ups and pdu systems by DCO Electrical Engineering

Related services

Combine with our other services

Frequently asked questions

Questions about ups and pdu systems

Practical answers from our technicians for businesses, industry and homeowners across Belgium.

A UPS, Uninterruptible Power Supply, bridges an interruption within its capacity and available autonomy. A PDU, Power Distribution Unit, distributes power but does not generate emergency power itself. For servers, production lines and medical systems, we examine which load genuinely requires support. On that basis, we discuss capacity, bridging time and, if necessary, controlled shutdown or coupling with an emergency generator.

DCO Electrical Engineering

Discuss ups and pdu systems with DCO Electrical Engineering?

Active throughout Belgium from Zaventem, with 25 years of experience and 24/7 support. Request a no-obligation quote or call us directly.