Active across Belgium – rapid interventions

DCO Electrical Engineering · Services

Cabling works and cable containment for businesses

DCO Electrical Engineering supports your business with data cabling, power cables, fibre-optic cabling, cable trays, cable containment systems, cable repair and cable penetrations. You benefit from an approach spanning advice and planning through to execution and maintenance, tailored to your existing infrastructure and business activities.

Cabling works

At a glance

What does DCO Electrical Engineering do for you in terms of cabling works?

DCO Electrical Engineering provides data cabling, power cables, fibre-optic cabling, cable trays, cable containment systems, cable repair and cable penetrations for businesses and industry. Execution is tailored to your electrical load, building, use and safety conditions. With 25 years of experience, we support you from preparation and installation to inspection and maintenance. You can count on services throughout Belgium and 24/7 support.

Target group
Commercial and industrial clients; private individuals where relevant
Operating area
Throughout Belgium · Fabrieksstraat 108, 1930 Zaventem
Support
24/7 support · 25 years of experience
Standards/Safety
VCA-certified; applicable AREI and safety regulations according to the installation

Cabling Works · 1

Installing data cabling and fibre-optic cabling

Reliable connections begin with a logical cabling plan. We discuss network points, technical rooms and future expansions before data cabling or fibre-optic cabling is installed. Bending radius, tensile load and separation from power cabling require careful attention. For connections between buildings, we also consider the route and the entry point. You receive an infrastructure that not only functions upon delivery, but also remains identifiable during future modifications.

For installing data cabling and fibre-optic cabling, we define the scope prior to execution. You discuss the current situation, the required operation and the conditions for site access with us. This allows the choice of materials, scheduling and any potential disruptions to be aligned with one another.

  • Preparation based on your building and use.
  • Coordination of execution, inspection and maintenance.

At DCO Electrical Engineering, we provide cable trays and cable containment systems that ensure safe, neat and structured routing of cabling in industrial and commercial environments. We install cable containment, wire mesh cable trays, cable ladders and conduit systems in accordance with the strictest safety standards and tailored to your building or installation.

Cabling works

Cabling Works · 2

Bespoke cable trays and cable containment systems

Cable trays, wire mesh trays, cable ladders and conduit systems give every cable a suitable route. We select support structures, bends and junctions based on load, accessibility and ambient conditions. Wear, heat and dust can affect lifespan; maintenance clearance is also a factor. In production halls, technical rooms and data centres, we provide expansion capacity where appropriate, so that new cables do not end up piled uncontrollably on top of existing bundles later on.

For bespoke cable trays and cable containment systems, we define the scope prior to execution. You discuss the current situation, the required operation and the conditions for site access with us. This allows the choice of materials, scheduling and any potential disruptions to be aligned with one another.

  • Preparation based on your building and use.
  • Coordination of execution, inspection and maintenance.

Our fitters ensure durable installation — from support structures to bends and junctions — so that cables are properly protected against wear, heat or dust. We align every route with your electrical schematics and future expansions, ensuring your infrastructure is ready for growth.

Cabling Works · 3

Power cables and industrial power connections

A power cable is selected on the basis of more than just the distance between two points. Power rating, installation method, environment and protection devices all determine the execution. We coordinate cabling works with distribution boards, emergency generator installation and FleXbus Installation: Reliable Power Connections for Industry. In doing so, we oversee the connection details and the sequence of work, so that the connection integrates into the overall electrical design.

For power cables and industrial power connections, we define the scope prior to execution. You discuss the current situation, the required operation and the conditions for site access with us. This allows the choice of materials, scheduling and any potential disruptions to be aligned with one another.

  • Preparation based on your building and use.
  • Coordination of execution, inspection and maintenance.

Do you need cable management within production halls, technical rooms or data centres? We deliver bespoke solutions focused on quality, order and ease of maintenance.

Cabling Works · 4

Repairing cables at height and in difficult-to-reach locations

In the event of damaged cables, we first investigate the condition and the potential cause. A local repair is not justifiable in every situation; replacement is sometimes required. For cabling works at height and in difficult-to-reach locations, we assess access, working space and equipment in advance. This prevents the execution from stalling at an inaccessible fixing point or a route that cannot be safely accessed during production.

For repairing cables at height and in difficult-to-reach locations, we define the scope prior to execution. You discuss the current situation, the required operation and the conditions for site access with us. This allows the choice of materials, scheduling and any potential disruptions to be aligned with one another.

  • Preparation based on your building and use.
  • Coordination of execution, inspection and maintenance.

Reliable Power Supply for Every Project — Emergency Generator Installation — Your Specialist in Generators

Cabling Works · 5

Core drilling, cable penetrations and clear commissioning

Drilling for cables and cable penetrations requires coordination with the building structure and existing pipework/conduits. We examine wall and floor build-ups before an opening is made. Where fire compartmentation applies, the firestopping seal must also comply. Following installation, clearly identified routes and labelling assist with maintenance and expansion. For data centre construction, we also discuss the relationship between cable routes, racks and the accessibility of technical facilities.

For core drilling, cable penetrations and clear commissioning, we define the scope prior to execution. You discuss the current situation, the required operation and the conditions for site access with us. This allows the choice of materials, scheduling and any potential disruptions to be aligned with one another.

  • Preparation based on your building and use.
  • Coordination of execution, inspection and maintenance.

Additional focus points within your project

  • Cabling works
  • Installing data cabling
  • Installing cable trays and cable containment systems
  • Installing power cables
  • Installing fibre-optic cabling
  • Specialised cabling works carried out by us for businesses and industry
  • Data centre construction
  • Emergency Generator Installation: Reliable Power Supply for Every Project
  • FleXbus Installation: Reliable Power Connections for Industry
  • Cabling works at height and in difficult-to-reach locations
  • Repairing cables
  • Drilling for cables and cable penetrations

DCO Electrical Engineering is located at Fabrieksstraat 108, 1930 Zaventem and operates throughout Belgium. You can rely on 25 years of experience, a VCA-certified organisation and 24/7 support. As part of DCO Group, alongside DCO Bouw and DCO IT, we align electrical engineering requirements with the broader context of your building and infrastructure.

Project gallery

Photos of cabling works by DCO Electrical Engineering

Frequently asked questions

Questions about cabling works

Practical answers from our technicians for businesses, industry and homeowners across Belgium.

Reliable connections begin with a logical cabling plan. We discuss network points, technical rooms and future expansions before data cabling or fibre-optic cabling is installed. Bending radius, tensile load and separation from power cabling require careful attention. For connections between buildings, we also consider the route and the entry point. You receive an infrastructure that not only functions upon delivery, but also remains identifiable during future modifications.

DCO Electrical Engineering

Discuss cabling works with DCO Electrical Engineering?

Active throughout Belgium from Zaventem, with 25 years of experience and 24/7 support. Request a no-obligation quote or call us directly.