Active across Belgium – rapid interventions

DCO Electrical Engineering · Services

Energy solutions for businesses and industry

DCO Electrical Engineering supports your business with capacitor banks, energy analyses, energy-saving studies, power quality meters, smart meters, and energy monitoring. You receive an approach from advice and planning to execution and maintenance, tailored to your existing infrastructure and business activities.

Emergency power supply via UPS systems

At a glance

What does DCO Electrical Engineering do for you in terms of energy solutions?

DCO Electrical Engineering provides capacitor banks, energy analyses, energy-saving studies, power quality meters, smart meters, and energy monitoring for businesses and industry. Execution is tailored to your electrical load, building, usage, and safety requirements. With 25 years of experience, we support you from preparation and installation to inspection and maintenance. You can count on services across Belgium and 24/7 support.

Target group
Businesses and industry; private individuals where relevant
Operating area
All of Belgium · Fabrieksstraat 108, 1930 Zaventem
Support
24/7 support · 25 years of experience
Standards/Safety
VCA-certified; applicable AREI and safety regulations according to the installation

Energy solutions · 1

Installing capacitor banks based on your load

A capacitor bank compensates for reactive power and can improve the cos phi of your installation. We first investigate electrical load, usage patterns, and the requirements of your grid operator. Less reactive current does not automatically mean an identical reduction in your active energy consumption. Harmonics also warrant careful attention when selecting the installation. Sizing is therefore derived from measurements and calculations, not merely from the rated power of your machinery.

For installing capacitor banks based on your load, we define the scope prior to execution. You discuss with us the existing condition, desired operation, and workplace access conditions. This allows material selection, scheduling, and any potential outages to be coordinated.

  • Preparation based on your building and usage.
  • Coordination of execution, inspection, and maintenance.

Thanks to our experience in industry and collaboration with partners such as PWRloop, we provide advice and installations that contribute to reduced energy waste, lower energy bills, and reliable operation of your installations. With the right energy solution, you prepare your business for the future.

Energy solutions · 2

Power Quality and Smart Meters with actionable data

Power quality meters and smart meters provide visibility into various aspects of your installation. A smart meter tracks consumption; a suitable power quality measuring device can also help investigate voltage fluctuations, peak loads, and other quality issues. We discuss measurement points, recording periods, and the desired monitoring. Devices from brands including Janitza are selected based on the required measuring function. This allows you to gather data that your technical and financial managers can act upon effectively.

For power quality and smart meters with actionable data, we define the scope prior to execution. You discuss with us the existing condition, desired operation, and workplace access conditions. This allows material selection, scheduling, and any potential outages to be coordinated.

  • Preparation based on your building and usage.
  • Coordination of execution, inspection, and maintenance.

We carry out comprehensive energy analyses and energy-saving studies to help businesses optimise their consumption. In collaboration with our partner PWRloop, we analyse electricity, water, and gas, and provide advice on savings and optimisations. These reports form a solid foundation for investments in renewable energy and efficient energy management. This gives you a clear overview of your consumption and opportunities to reduce costs.

Energy solutions · 3

Energy analyses and energy-saving studies

Together with our partner PWRloop, we analyse electricity, water, and gas where relevant. A study brings together consumption, operating hours, and potential optimisations. We distinguish between control adjustments, maintenance measures, and investments in renewable energy, allowing you to compare different options. The calculation sets out assumptions and boundary conditions. As a result, the report provides a practical basis for decisions, without promising fixed savings before your installation has actually been examined.

For energy analyses and energy-saving studies, we define the scope prior to execution. You discuss with us the existing condition, desired operation, and workplace access conditions. This allows material selection, scheduling, and any potential outages to be coordinated.

  • Preparation based on your building and usage.
  • Coordination of execution, inspection, and maintenance.

A stable and high-quality power supply is crucial for any business. That is why we install power quality meters and smart meters that continuously monitor the energy consumption and quality of your electrical installation. With these systems – from brands including Janitza – you gain insight into voltage fluctuations, peak loads, and energy losses. Thanks to the data, you can intervene preventively and make your installation more reliable and efficient.

Energy solutions · 4

EMS Systems – Energy management & monitoring

Energy management only works when measurement data leads to concrete actions. With EMS Systems – Energy management & monitoring, trends, anomalies, and usage patterns can be monitored. We look at what data your organisation requires and who evaluates it. Alarms, reporting, and review schedules are aligned accordingly. A clear distinction between consumption and power quality prevents a rising bill from being automatically attributed to a technical network problem.

For EMS systems – energy management & monitoring, we define the scope prior to execution. You discuss with us the existing condition, desired operation, and workplace access conditions. This allows material selection, scheduling, and any potential outages to be coordinated.

  • Preparation based on your building and usage.
  • Coordination of execution, inspection, and maintenance.

Complete energy management systems for businesses — EMS Systems – Energy management & monitoring Energy-conscious

Energy solutions · 5

From measurement results to feasible energy optimisation

Relighting from halogen to LED can be a logical next step when lighting has long operating hours. Elsewhere, adjusted control, compensation, or better load balancing may have a greater impact. We compare measures based on technical feasibility, operational impact, and expected costs. By measuring again after execution, you can see whether the chosen solution works as intended and where further improvement remains possible.

For the transition from measurement results to feasible energy optimisation, we define the scope prior to execution. You discuss with us the existing condition, desired operation, and workplace access conditions. This allows material selection, scheduling, and any potential outages to be coordinated.

  • Preparation based on your building and usage.
  • Coordination of execution, inspection, and maintenance.

Additional points of attention within your project

  • Energy solutions for businesses and industry
  • Installing capacitor banks
  • Energy analyses and studies
  • Power Quality and Smart Meters
  • Energy solution projects that we execute for businesses and industry
  • EMS Systems – Energy management & monitoring
  • Relighting: from halogen to LED for energy savings

LED lighting for energy savings — Re-Lighting: save on energy costs — Introduction to our relighting

DCO Electrical Engineering is located at Fabrieksstraat 108, 1930 Zaventem and operates throughout Belgium. You can rely on 25 years of experience, a VCA-certified organisation, and 24/7 support. As part of DCO Group, alongside DCO Bouw and DCO IT, we align electrical engineering requirements with the broader context of your building and infrastructure.

Project gallery

Photos of energy solutions by DCO Electrical Engineering

Related services

Combine with our other services

Frequently asked questions

Questions about energy solutions

Practical answers from our technicians for businesses, industry and homeowners across Belgium.

A capacitor bank compensates for reactive power and can improve the cos phi of your installation. We first investigate electrical load, usage patterns, and the requirements of your grid operator. Less reactive current does not automatically mean an identical reduction in your active energy consumption. Harmonics also warrant careful attention when selecting the installation. Sizing is therefore derived from measurements and calculations, not merely from the rated power of your machinery.

DCO Electrical Engineering

Discuss energy solutions with DCO Electrical Engineering?

Active throughout Belgium from Zaventem, with 25 years of experience and 24/7 support. Request a no-obligation quote or call us directly.