Active across Belgium – rapid interventions

DCO Electrical Engineering · businesses & homeowners

Electrotechnical solutions and specialisations

From general electrical works and rapid repairs to complex industrial installations, lighting, security, data centers and backup power across Belgium.

Complete overview

All services, specialisations and works at a glance

Alongside our core services, DCO Electrical Engineering delivers specialised disciplines that fit together seamlessly — for businesses, industry and homeowners.

Single point of contact

Combining multiple disciplines or looking for a subcontractor?

From lighting studies and cable trays to UPS, backup generators, CCTV and fire detection: we align every discipline, day and night, across Belgium.

Specialised electrical works that set us apart

Work we carry out for large businesses and industry

At DCO Elektriciteitswerken, we take pride in our expertise in specialised electrical work that few others in Belgium can carry out. We focus on complex and innovative projects that take your electrical installations to the next level, with precision and craftsmanship at the heart of our approach.

Fire detection in collaboration with BEMAC
Specialisation 01

Fire detection in collaboration with BEMAC

Certified industrial fire detection, cabling and interconnection in collaboration with BEMAC.

Data centre construction
Specialisation 02

Data centre construction

Power distribution, cable trays, cooling and critical infrastructure for data centres.

EMS systems – Energy management & monitoring
Specialisation 03

EMS systems – Energy management & monitoring

Real-time monitoring, power quality and control of your energy consumption.

Lighting studies: optimal lighting with maximum savings
Specialisation 04

Lighting studies: optimal lighting with maximum savings

Professional lighting calculations for optimal visibility and maximum energy savings.

Gate automation: installation of automatic gates
Specialisation 05

Gate automation: installation of automatic gates

Electrical controls, cabling and safe automation of business and entrance gates.

Mast installation for lighting, CCTV surveillance and emergency lighting
Specialisation 06

Mast installation for lighting, CCTV surveillance and emergency lighting

Installation and connection of masts for site lighting, cameras and emergency lighting.

Emergency lighting: installing robust and durable emergency lighting
Specialisation 07

Emergency lighting: installing robust and durable emergency lighting

Robust, standards-compliant emergency and evacuation lighting for every business building.

Re-lighting: from halogen to LED for energy savings
Specialisation 08

Re-lighting: from halogen to LED for energy savings

Conversion of halogen and fluorescent lighting to durable, high-efficiency LED lighting.

Backup generator installation: reliable power for every project
Specialisation 09

Backup generator installation: reliable power for every project

Complete installation, connection and changeover switching of reliable backup generators.

FleXbus installation: reliable power connections for industry
Specialisation 10

FleXbus installation: reliable power connections for industry

Flexible, high-capacity FleXbus power connections for heavy industrial installations.